PRIVATE - Charred timber cladding.

Coleman Anderson’s Associate Director Tony Trifiletti has recently completed the on site works for this contemporary extension in Tunbridge Wells. CAA were appointed from the initial design through to completion of the build. Tony worked closely with the client and the builder to ensure that the detailing was correct and the extension was finished to the highest of standards.

The use of burnt timber cladding and slim profiled glazing creates a unique contrast between the existing dwelling and the new extension.

9b18861f-b5d1-4202-97ef-b25510e728e7.JPG
531d9a64-5ad5-49b9-9548-f6dd48a8f45e.JPG
b715118e-a5bb-45e5-8c36-42b82873ddcf.JPG

Coleman Anderson provide a full architectural package from RIBA stage 0-7. If you are thinking of having work carried out at your property, or have a development opportunity, please feel free to contact us for a no obligation quotation and advice. 

IMAGE.JPG
Stuart Coleman